8/12/2023 0 Comments Free fall life boat![]() ![]() All used material or equipment should be returned to the appropriate position/condition as before the drill. Special care should be made to the appropriate use of personal equipment and the procedure of lowering and deploying abandon ship means (boats or rafts). Distress signal/message submitted to coastal stations and nearby vesselsĪfter completing the drill, the safety officer should debrief the crew referring to all stages of execution.Appropriate and operational means (Boats/rafts, cranes, davits, pilot ladders).Trained crew (certified and well-trained through drills and briefings).The following are pre-required in order to execute the abandoning of vessel: In drills, do not attempt to embark all crew in the boat without ensuring that it is properly secured in storage position. The final release order is given by Master.ĭuring drills, the embarkation in both side boats and FFB should be real, in securing position with all available securing equipment in place. All hatches must be secured and the engine to be ready for use. Safety officer is responsible to check the appropriate fastening of the crew and report to Master. In case of FFB, the crew should proceed to assigned seats and fasten the seat belts. The final release is again subject to the Master’s approval. In case of on load release, the embarkation is conducted as soon as the boat is to the appropriate side position. ![]() The rest of the crew will embark using a side pilot ladder and Master will be the last one to embark. The control of brake is under safety officer’s supervision and the whole operation is subject to the Master’s approval. The engine should be tested and put to continuous work (when waterborne).Īs soon as the side boat and the normal lowering procedure is in place, then the boat should be lowered into water -only with the assigned crew onboard- using davits or cranes. In this case, only the crew assigned/trained and authorized to operate the lifeboat will be embarked and lowered with the boat. In conditions of calm sea and time availability, the abandon ship mean (boat or raft) should be lowered into sea water and an embarkation pilot ladder is to be used. In case of free-fall boat (FFB), or on load release side boat, this stage follows the embarkation stage. Stage #2: Lowering the boat/raft into the water
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |